Section 1      Integrated urban transport planning

Article 104    Plan target

With the central area of Fuzhou as a hub, depending on Fuzhou-Yinchuan Expressway, Fuzhou-Ji’an Expressway, Xiangtang-Putian Railway, China National Highway 316, Donglin Road, Fuba Road, Changxia Road, Fufeng Road, Fu River and Nanchang Changbei International Airport, we will build an integrated land, water and air transportation system with smooth entry and exit, convenient connection, fast transit and reasonable layout of static traffic facilities.

Article 105    Construction of expressways

Acting in concert with development planning of national and provincial high-grade expressways, we will accelerate the outward transportation construction of the central urban area, and form “one transverse and one longitudinal” expressway thoroughfares:“One longitudinal” refers to Fuzhou-Ji’an Expressway (Ji’an-Fuzhou-Zixi), which meets Fuzhou-Yinchuan Expressway in Changgang Village of Chonggang Town, Linchuan District; and “one transverse” refers to Fuzhou-Yinchuan Expressway. These two expressways will become the main outward traffic thoroughfares of the central urban area of Fuzhou.

Article 106    Construction of roads

China National Highway 316 will be reconstructed according to the first or second class road standards, and the urban section will be constructed according to the first class road standard. Donglin Road has been constructed as a first-class road; Changxia, Fuba and Fufeng provincial roads will be constructed according to the second-class standard; the county and township roads will reach the third and fourth class standards; and the rural area will basically realize the goal of having village-to-village cement roads.

Article 107    Construction of railways

We will retain Shanghai-Kunming Railway and Yingtan-Xiamen Railway while improving the transportation capacity of these two railways. In the short run, we will positively construct Xiangtang-Putian Railway and Hangzhou-Nanchang-Changsha Passenger Dedicated Railway Line, and in the long run, we will construct Yingtan-Shantou Railway and Ji’an-Wenzhou Railway, thus forming a “two-transverse-and-two-longitudinal” railway network in the city. In the central urban area, we will focus on the construction of Xiangtang-Putian Railway, and strive to extend the Yingtan-Shantou Railway into the central urban area of Fuzhou in the short term, and in the long term, we will try to build Xiangtang-Putian Railway into a passenger dedicated line, and newly construct a freight special line of Xiangtang-Putian Railway.

Article 108    Construction of waterway

We will dredge the waterway of Fu River and enhance its shipping capacity, thus helping Fu River reach Class IV shipping standards; we will also widen the waterways of Yihuang River and Chongren River, and boost their shipping capacities correspondingly.

Article 109    Construction of airways

Fuzhou should make full use of Nanchang Changbei International Airport to provide freight and passenger air transport, thus better serving the economic development. And in the long run, we can consider the preliminary study of Fuzhou Airport.

Article 110    Transit traffic in the central urban area

It’s planned to construct Huancheng West Road in the west of area of Wenquan Town, and Huancheng South Road in the south of the city, which will connect Fuba Road and China National Highway 316. The Huancheng North Road will be constructed nearby the Fu River in the north of the central urban area, which will connect Huancheng West Road and China National Highway 316 and form the outer ring for the city’s outward traffic together with China National Highway 316 in the east. This will cut Donglin Road, Changxia Road, Fuba Road and Fufeng Road at Huancheng Road so as to avoid the disturbance of through traffic against the central urban area and ensure the peace of the central urban area.

Article 111    Outward static traffic facility planning

It’s planned to construct Fuzhou Railway Passenger Station nearly Xiangtang-Putian Railway in the southwest of central urban area, which is a Class II passenger station.

It’s planned to reconstruct Fubei Railway Station and expand its size as appropriate, making it the freight station in Fuzhou that serves for the industrial development of this city.

It’s planned to retain Fuzhou Bus Station, Wenchang Passenger Station and Shangdundu Bus Station, which will continue to serve the city.

It’s planned to build a coach station in the south side of Fuzhou Railway Station according to Class II standards, with an area of 5.5 hectares.

It’s planned to build a bus station at the junction of Chengbei East Road and Shutong Road according to Class II standards, with an area of 2.5 hectares.

It’s planned to build a bus station in Shangdundu area according to Class II standards, with an area of 2.1 hectares.

It’s planned to change Wudian Bus Station into a Terminal Bus Station.

Section 2      Urban road traffic planning

Article 112    Road network planning

1.    Road class planning: urban roads are divided into three classes, namely arterial road, sub-arterial road and branch road.

The distance for two arterial roads should be 800 to 1,200 m or so; the distance of 300 to 500 m or so for sub-arterial road and arterial road, and the distance of about 150 to 250 m for branch road and sub-arterial road.

Road width: the width of arterial road should be controlled between 40 to 80 m; sub-arterial road between 24 to 36 m, and brand road between 12 to 20 m.

2.    Urban road network planning

The central area of Fuzhou has developed a “nine-longitudinal-eight-transverse-and-four-ring” urban main road square grid pattern, which is formed by Huancheng roads and arterial roads of the city. We will build up an urban road network with arterial and sub-arterial roads as framework as well as distinctive transport corridors and complete branch roads.

(1)   Arterial road system

The outer ring expressways, radiated roads and the entrance and exit passageways will constitute the framework of the city, and together with other arterial roads, they will constitute the arterial road system, and form the “nine-longitudinal-eight-transverse-and-four-ring (including the outer ring road)” road framework.

Eight transverse roads: Dagong Road (24 to 40 m), Linchuan Avenue (40 to 60 m), Zhongling Avenue (45 m), Yingbin Avenue (80 m), Rulin Avenue (60 m), Chonggang (40 m), Wenchang Road (60 m) and Longfa Road (40 m).

Night longitudinal roads: Yuming Road (40 m), Furong Road (60 m), Fubei Avenue -Xijin Avenue-Fenggang Avenue (45 to 50 m), Yuming Avenue (45 to 50 m), Jinchao Avenue (50 m), Wenchang Avenue (50 to 60 m), Gandong Avenue (33 to 55 m), Jinni Avenue (45 m), Menghu Avenue -Yanshu Avenue (45 m).

Four ring roads refer to the outer ring road and the three inner ring roads. The outer ring road means the urban ring expressway, while the inner ring road indicates the three arterial ring roads of the city: the first ring road is Donggong Road-Wenchang Avenue-Yingbin Avenue-Xijin Avenue-Dagong Road; the second ring road is Yingbin Avenue-Wenchang Avenue-Rulin Avenue-Fenggang Avenue-Yingbin Avenue; and the third ring road is Linchuan Avenue-Hexi Avenue-Rulin Avenue-Furong Road.

(2)   Sub-arterial road system

The sub-arterial road is the main road that connects the arterial road and branch road, and that gathers the non-motor vehicles, mainly including Xuefu Road (26 m), Qingyunfeng Road (30 m), Nanmen Road (36 m), Wutang Road (30 m), Jinfeng Road (30m), Zhushan Road (24 m), Longjin Road (24 m), Jianshe Road (30 m), Fudong Road (30 m), etc.

(3)   Branch road system

The branch road  is the main road for the traffic for going in/ out of neighborhoods, residential communities, and short-distance transportation (mainly referring to the non-motor vehicles), including Changfu Road (20 m), Hubin Road (20 m), etc.

Article 113    Road section planning

The planned boundary line width is ranged from 16 to 80 m, with various section forms. See the below table for details.

Table of the Main Road Network of Urban Area of Fuzhou

Name of road

Starting and ending points

Boundary line width(m)

Section form

Class

Remarks

Huancheng Road

Fulin Road to Beihuan Road

50

10-14-2-14-10

Ring road


Nanhuan Road

Chonggang Avenue to G316 urban section

50

10-14-2-14-10

Ring road


G316 urban section

Nanhuan Road to Beihuan Road

50

10-14-2-14-10

Ring road

Status quo

Beihuan Road

G316 urban section to Huancheng West Road

50

10-14-2-14-10

Ring road

Status quo

Xuefu Road

Beihuan Roadto Yuming Avenue

26

6-14-6

Sub-arterial road

Status quo

Yuming Avenue

Xuefu Road to Yingbin Avenue

42

6.6-6-1.5-15-1.5-6

Arterial road

Status quo

Yuming Avenue

Yingbin Avenue to Fuhe Avenue

50

10-5.5-1.5-16-1.5-5.5-10

Arterial road

Status quo

Jinchao Avenue

Motor plant to Wenchang Avenue

50

10-5.5-1.5-16-1.5-5.5-10

Arterial road

Status quo

Xijin Avenue

Fuhe Avenueto Linchuan Avenue

50

10-14-2-14-10

Arterial road


Fenggang Avenue

Linchuan Avenue to Nanhuan Road

50

10-14-2-14-10

Arterial road


Jinchao Avenue

Motor plant to the south side of Fuhe Bridge

60

13-5-4-4-18-4-4-5-3

Arterial road

Status quo

Jinpeng Avenue

Fuhe Avenue to Chonggang Avenue

40

6-5-1.5-15-1.5-5-6

Arterial road

Status quo

Jinni Avenue

Yingbin Avenueto Chonggang Avenue

45

8-5.5-1.5-15-1.5-5.5-8

Arterial road

Status quo

Gandong Avenue

Huancheng North Road to Jinni Avenue



Arterial road

Status quo

Including

Huancheng North Road to the District Auditing Bureau

33

6-12-6

Arterial road

Status quo

District Auditing Bureau to Yingbin Avenue

40

6-5-1.5-15-1.5-5-6

Arterial road

Status quo

Yingbin Avenueto Wenchang Avenue

55

10.5-4-4-18-4-4-10.5

Arterial road

Status quo

Wenchang Avenue

Yanghe Overpass to Fuhe Bridge

60

7-6-4-4-18-4-4-6-7

Arterial road

Status quo

Wenchang Avenue

Huancheng South Road to Nanhuan Road

50

6-4-14-2-14-4-6

Arterial road

Status quo

Fuhe Avenue

Huancheng SouthRoad to Gandong Bridge

30

6-18-6

Sub-arterial road

Status quo

Fuhe Avenue

Huancheng SouthRoad to Gandong Bridge

26

6-14-6

Sub-arterial road

Status quo

Fubei East Road

Fubei Bridge to Shutong Road

40

8-24-8

Arterial road


Dagong Road

Shutong Road to the west of Wenchang Bridge

24

5-14-5

Arterial road

Status quo

HuanchengSouth Road

Xuefu Road to Fuhe Avenue

26

6-14-6

Sub-arterial road

Status quo

Fubei Avenue

No. 1 Fubei Road to Fubei East Road

45

6.5-4-4-16-4-4-6.5

Sub-arterial road

Status quo

Tiyu Road

Menghu Avenue to Gandong Avenue

26

6-14-6

Sub-arterial road

Status quo

Qingyunfeng Road

Gandong Avenue to Fuhe Avenue

26

6-14-6

Sub-arterial road

Status quo

Linchuan Ave

Xihuan Road to Fuhe Avenue





Including

Hexi Avenue to Xijin Avenue

60

11-8-2-1-8-2-8-11

Arterial road

Status quo

Xijin Avenue to Gaoqiao Bridgehead

50

6-7-3-18-3-7-6

Arterial road

Status quo

Gaoqiao Bridgehead to the roundabout nearby the CBC outlet

40

6-5-1.5-15-1.5-5-6

Arterial road

Status quo

Wenchang Avenue to Fuhe Avenue

45

8-1.5-15-1.5-5.5-8

Arterial road

Status quo

Yingbin Avenue

Fenggang Avenue to Fuhe Avenue

80

12.25-6.5-4.0-11.75-11.0-11.75

-4.0-6.5-12.25

Arterial road

Status quo

Zhongling Avenue

Fenggang Avenue to Fuhe Avenue

45

8-5.5-1.5-15-1.5-5.5-8

Arterial road

Status quo

Rulin Avenue

Fenggang Avenue to Hexi Avenue

60

11-7-3-18-3-7-11

Arterial road

Status quo

Weisi Road

Gandong Avenue to Chonggang Avenue

40

6-5-1.5-15-1.5-5-6

Arterial road


Zhanqian Road

Fenggang Avenue to Jinni Avenue

50

10-5.5-1.5-16-1.5-5.5-10

Arterial road


Keji Avenue

Yingbin Avenueto Rulin Avenue

50

10-5.5-1.5-16-1.5-5.5-10

Arterial road


No. 10 Fubei Road

No. 1 Fubei Road to No. 11 Fubei Road

30

6-18-6

Sub-arterial road

Status quo

No. 1 Fubei Road

Fubei Avenue to No. 10 Fubei Road

20

4-12-4

Branch road


No. 3 Fubei Road

Fubei Avenue to No. 10 Fubei Road

40

8-24-8

Arterial road


No. 5 Fubei Road

Fubei Avenue to No. 10 Fubei Road

40

6-5-1.5-15-1.5-5-6

Arterial road


No. 7 Fubei Road

Fubei Avenue to No. 10 Fubei Road

24

5-14-5

Sub-arterial road


No. 9 Fubei Road

Provincial road to Fubei Avenue

30

6-18-6

Sub-arterial road


Yangzhou Avenue

Yanghe Overpass to Hebin Bridge

60

11-7-3-18-3-7-11

Arterial road

Status quo

Zhongzhoudi Road

Hebin Avenue to Hebin Avenue

30

8-14-8

Sub-arterial road

Status quo

Dagong East Road

Wenchang Bridge to Yanghe Overpass

26

6-14-6

Sub-arterial road

Status quo

Jinfeng Road

Yingbin Avenue to Yuming Avenue

30

6-18-6

Sub-arterial road

Status quo

Shutong Road

Fuhe Avenue to Menghu Avenue

45

6.5-4-4-16-4-4-6.5

Arterial road


Menghu Avenue

Linchuan Avenue to Fubei East Road

45

6.5-4-4-16-4-4-6.5

Arterial road


Yanshu Avenue

Linchuan Avenue to Fenggang Avenue

45

6.5-4-4-16-4-4-6.5

Arterial road


No. 2 Xijia Road

Fubei East Road to Tiyu Road

30

6-18-6



Shangyanhe Road

Beihuan Road to Wenchang Bridgehead

30

6-18-6

Sub-arterial road

Status quo

Xiayanhe Road

Wenchang Bridgehead to Qingyunfeng Road

26

6-14-6

Sub-arterial road

Status quo

Wutang Road

Qingyunfeng Road to Jinni Avenue

30

6-18-6

Sub-arterial road


Beishan Road

Yangui Roadto Jinchao Avenue

40

6-5-1.5-15-1.5-5-6

Arterial road


HuanchengNorth Road

Fuhe Avenueto Menghu Avenue

30

6-18-6

Sub-arterial road


Yangui Road

Xijin Avenueto Linchuan Avenue

30

6-18-6

Sub-arterial road


Nanmen Road

FenggangRiver to Gandong Avenue

36

8-20-8

Sub-arterial road

Status quo

Shangye Avenue

Gandong Avenue to Fuhe Avenue

40

6-5-1.5-15-1.5-5-6

Sub-arterial road

Status quo

Zhushan Road

Fenggang Avenue to Siji Road

24

5-14-5

Sub-arterial road


Zhushan Road

Yuming Avenue to No.1 Kezong Road

24

5-14-5

Sub-arterial road


Huiquan Road

Yuming Avenue to Fuhe Avenue

30

6-18-6

Sub-arterial road

Status quo

No. 2 Zhanbei Road

Fenggang Avenue to Jinchao Avenue

30

6-18-6

Sub-arterial road


No. 3 Zhanbei Road

Yuming Avenue to Jinchao Avenue

24

5-14-5

Sub-arterial road


Wei’er Road

Fenggang Avenue to Wenchang Avenue

30

6-18-6

Sub-arterial road


No. 4 Guihua Road

Jinchao Avenue to Chonggang Avenue

30

6-18-6

Sub-arterial road


No. 1 Kezong Road

Yingbin Avenue to Zhongling Avenue

30

6-18-6

Sub-arterial road


No. 2 Kezong Road

Yingbin Avenue to Rulin Avenue

30

6-18-6

Sub-arterial road


No. 3 Kezong Road

Yingbin Avenue to Zhongling Avenue

24

5-14-5

Sub-arterial road


No. 6 Yuanzong Road

Jinpeng Avenue to Chonggang Avenue

30

6-18-6

Sub-arterial road


Hexi Avenue

Linchuan Avenue to Rulin Avenue

40

6-5-1.5-1.5-1.5-5-6

Arterial road


Jianxian Road

Linchuan Avenue to Huancheng South Road

40

6-5-1.5-1.5-1.5-5-6

Arterial road

Status quo

Furong Road

Linchuan Avenue to Huancheng South Road

60

11-8-2-18-2-8-11

Arterial road


Wenchang Road

Hexi Avenue to Longfa Road

60

11-8-2-18-2-8-11

Arterial road


Longfa Road

Binhe Road to Linchuan East Road

40

6-5-1.5-1.5-1.5-5-6

Arterial road


Linchuan East Road

Huancheng South Road to No.9 Fubei Road

30

6-18-6

Sub-arterial road


Fulin Road

Linchuan Avenue to Huancheng South Road

30

6-18-6

Sub-arterial road

Status quo

Binhe Road

Linchuan Avenue to Rulin Avenue

26

6-14-6

Sub-arterial road

Status quo

Longjin Road

Linchuan Avenue to Rulin Avenue

24

5-14-5

Sub-arterial road

Status quo

Fuxi Road

Linchuan Avenue to Rulin Avenue

30

6-18-6

Sub-arterial road

Status quo

Fudong Road

Linchuan Avenue to Rulin Avenue

30

6-18-6

Sub-arterial road

Status quo

Qingfeng Road

Binhe Road to Linchuan East Road

24

5-14-5

Sub-arterial road


Jianshe Road

Yuming Road to Linchuan East Road

36

8-20-8

Sub-arterial road


Caizi Road

Yuming Road to Linchuan East Road

30

6-18-6

Sub-arterial road


Fengjia Road

Fuxi Road to Linchuan East Road

30

6-18-6

Sub-arterial road


Article 114    Urban public transport planning

We will give priority to the development of public transport, guide the reasonable transport mode and structure, give full play to the function of urban public transport, improve the accessibility and service level of public transport, strengthen the construction of public transport hub, organize the public transport line properly, improve the coverage of public transport and its service level, and form a rational transport structure system.

1.    Planning of public transport network

By 2010, there will have been 8 standard buses for every 10,000 people in the central urban area of Fuzhou, and there will have been over 400 vehicles in total. By 2020, there will have been 10 standard buses for every 10,000 people, and there will have been over 750 vehicles in total.

The density of public transport network in the central area and the fringe area will be 3.0 to 4 km/km2 and 2.5 km/km2 respectively.

The average length of public transport line will be around 8 to 12 km.

The public transport lines are planned to be 35.

2.    Planning of public transport station facilities

It’s planned to retain and expand the existing public transport station in Wenchang Avenue, and other public transport stations will be allocated according to the city development layout.

Table of Layout of Public Transport Station Yards

Name

Area (m2)

Location

Remarks

Name

Area (m2)

Location

Remarks

Changling

11,000

Wenchang Avenue

Expanded

Ximenkou

6,000

Dagong Road

Newly built

Chengwai

28,000

Wenchang Avenue

Newly built

Fujiadi

8,000

South Daqiao Road

Newly built

Fubei

15,000

Fubei Avenue

Newly built

New administrative area

8,000

Zhongling Avenue

Newly built

Railway passenger station

25,000

Railway passenger station

Newly built

Shangdundu

18,000

Longfa Avenue

Newly built

The initial and terminal stations are generally built at the wide and open place near main passenger hubs in the urban central area, and its land use should be controlled at around 1000 to 1400 m2.

List of Initial and Terminal Stations and Junction Stations

Name

Nature

Area (m2)

Remarks

Station

Nature

Area (m2)

Remarks

Xinjianzikou

Initial and terminal station

0

Using the integrated parking lot

Modern School

Initial and terminal station

2,600

Newly built

Zhongling South Station

Initial and terminal station

2,600

Newly built

Wuhuangdian

Initial and terminal station

2,600

Newly built

Ximenkou

Initial and terminal station

2,600

Newly built

Changling

Initial and terminal station

3,900

Newly built

Sports Center

Junction station

5,600

Newly built

Beimen

Initial and terminal station

3,900

Newly built

North Station

Initial and terminal station

3,900

Newly built

Business center of the new area

Junction station

5,600

Newly built

Linchuan Winery

Initial and terminal station

2,600

Newly built





Article 115    City square planning

It’s planned to retain the existing Xuefu Square, which is a recreational city square with an area of 0.85 hectares.

It’s planned to retain the city administration square in front of the administration center of the new area of the city, which is an integrated downtown square with an area of 3.0 hectares.

It’s planned to reconstruct Jinchao Square at the junction of Jinni Avenue and Zhongling Avenue, which is the major recreational square of Jinchao Development Zone with an area of 1.7 hectares.

It’s planned to build a square in front of Fuzhou Railway Station, which will be a traffic evacuation square with an area of 6.0 hectares.

It’s planned to build a square at the junction of Zhongling Avenue and Keji Avenue, which will be the major recreational square of the educational park with an area of 2.0 hectares.

It’s planned to retain Shangdundu Luojiagang Square and Shangdundu Square, both of which will be recreational squares, covering an area of 0.62 hectares and 0.62 hectares respectively.

Article 116    Planning of urban parking lots and gas stations

1.    Parking lots

It’s planned to build 9 parking lots in the urban area, mainly at the outer ring road and nearby the main entrance and exit passageways, plus supporting service facilities. Each parking lot will cover an area of 2.0 hectares or so, see the table below.

Table of Large Parking Lots


Name

Location

Area (hectare)

 

Remarks

1

Fubei parking lot

To the south of No. 8 Fubei Road and to east of No. 10 Fubei Road

3.0

Planned

2

Wenchang parking lot

To the east of Wenchang Road and to the west of China National Highway 316

2.0

Planned

3

Parking lot of Wenchang Passenger Station

At the opposite of the passenger station

1.0

Planned

4

Chengbei parking lot

To the south of Fubei Road and to the west of Jingjiu Road

2.5

Planned

5

Chengxi parking lot

To the north of Rulin Avenue and the east of Yuming Avenue

2.0

Planned

6

Parking lot of the railway passenger station

To the north of the parking lot of the railway passenger station

3.0

Planned

7

Parking lot of the Commerce City

To the north of the Commerce City

4.5

Planned

8

Chengxinan parking lot

To the north of Nanhuan Road and to the west of Xihuan Road

5.0

Planned

9

Hexi parking lot

To the south of Linchuan Avenue and to the west of Fulin Road

1.5

Planned

2.    Gas stations

Gas stations are planned to be built based on the service radius of 1.2-1.5km in the central urban area, with a service area of 4 to 7 km2.

Article 117    Planning of urban bridges

It’s planned to build 3 expressway bridges cross Fu River, namely, Gandong Bridge (connecting the north extension of Gandong Avenue and Wenchang Avenue), Nanhuan Bridge (connecting Nanhuan Avenue over Fu River and China National Highway 316), and Chengbei Bridge (Fubei Industrial Zone to China National Highway 316). Together with the existing Fubei Bridge, Wenchang Bridge, Fuhe Bridge, and Donglin Bridge, there will be 7 highway bridges crossing Fu River. Moreover, two more bridges will be built crossing Yihuang River at Huancheng South Road and Linchuan East Road, which will better connect the main urban area with Fubei District, Wenchang District, Shangdundu area and the surrounding cities and counties.

It’s planned to build a railroad bridge across Fu River for Xiangtang-Putian Railway.

Section 3      Urban water supply project planning

Article 118    Planning of water source and water consumption

The water source will be taken from the upstream section of urban central area of Fu River and the surface water of Yihuang River, with Liaofang Reservoir serving as its emergency water source. In the surroundings of the water source site, vegetation should be built to protect its ecological environment within a 100 m radius of the water-taking site, and any possible polluting activities are not allowed; and no drainage outlets and discharge of other pollutants are allowed from 1,000 m upstream and 100 m downstream of the water-taking site so as to ensure the water source is up to the Grade II standards of the national Water Quality Standards for the Drinking Water Source (GJ3020—93).

The daily consumption of the central urban area of Fuzhou will be 225,000 m3 and 450,000 m3 in the near and long term respectively.

Article 119    Urban water supply facility planning

Recently, Linchuan Water Works will be relocated to the south of Shangdundu and the east bank of Yihuang River for expansion; and in the future, the water works in Jinggong Road will be demolished and the original water will be taken by the water intake pumping station of Zhongling Water Works and be transported to the Nanqu Water Works. And Fubei Water Works, Nanqu Water Works, and Zhongling Water Works should be reconstructed, while the water of the central urban area will be offered by the networking of Nanqu Water Works, Zhongling Water Works and Linchuan Water Works, with the water supply capacity reaching 460,000 m3/d.

Table of Water Works in the Downtown Area of Fuzhou

Name of Water Works

Current status

Planning

Floor area

(hm2)

Water supply scale

 

(ten thousand m3/d)

In the near term

In the long term

Area

(hm2)

Water supply scale

 

(ten thousand m3/d)

Area

(hm2)

Water supply scale

 

(ten thousand m3/d)

Fubei Water Works

1.91

1

1.91

1

11.00

6

Jinggong Road Water Works

0.80

5

0.80

5

Plan canceled

Nanqu Water Works

1.65

3

1.65

3

2.75

10

Zhonglin Water Works

8.67

10

8.67

10

13.21

20

Linchuan Water Works

0.85

3

4.86

10

4.86

10

The water supply pervasion of municipal water works will reach 95% in the near term and 100% in the long term.

Article 120    Water supply pipe network planning

Water pipes connecting the water intake to the water works: Fubei Water Works will use two DN800 reinforced concrete pipelines; Nanqu Water Works will use two DN1000 reinforced concrete pipes, and as the water works is distant from the water intake, two communicating pipelines will be laid in the middle; Zhongling Water Works will use two DN1200 reinforced concrete pipelines; and Linchuan Water Works will use two DN1000 reinforced concrete pipelines.

Water output pipes of water works: Fubei Water Works will use two DN1000 steel pipelines; Nanqu Water Works will also use two DN1000 steel pipelines; Zhongling Water Works will use DN1400 steel pipelines; and Linchuan Water Works will use two DN1000 steel pipelines.

The main pipes will be laid along the arterial roads into a circular ring, with interval between main pipes of 500-800 m.

Section 4      Urban drainage project planning

Article 121    Drainage system planning

Most part of Chengbei residential area and Menghu residential area of the old urban area will reserve closure and combining drainage system, while Shangdundu area, Fubei area, the new urban area and Wenchang residential area and Chengxi residential area of the old urban area will use rain-sewage diverted drainage system. In the long run, the old urban area will use rain-sewage diverted drainage system.

Article 122    Rainwater drainage project planning

The rainwater in the central urban area will be discharged into the nearest inland river water system by different areas. And the rainwater in the west of the old urban area and the tail water of Fuzhou Sewage Treatment Plant will be discharged into Fu River through the main rainwater channels; rainwater in Shangdundu area will be discharged into the nearby Tiaoshi Channel, Yufang Channel and Yihui Channel; while rainwater of other areas will be discharged into Fu River, Yihuang River and Fenggang River directly through the rainwater pipes.

Article 123    Sewage discharge project planning

The central urban area of Fuzhou discharges wastewater of 180,000 m3/d and 360,000 m3/d in the near and long terms respectively.

The central urban area can be divided into five discharge areas, namely the southern area, the northern area, Shangdundu area, Fubei area and Wenchang area. The old urban area (including Chengbei residential area, Chengxi residential area, Chengzhong residential area and Menghu residential area), new administration area and Jinchao Development Zone, and the northern Zhanqian new area will discharge their sewages into Fuzhou Sewage Treatment Plant; Jinchao Development Zone and southern Zhanqian new area will discharge their sewage into Jinchao Sewage Treatment Plant; Shangdundu area, Fubei area and Wenchang residential area will discharge their sewage to Linchuan, Fubei and Qiaodong sewage treatment plants through the sewage drainage pipes; while the sewage from the central urban area will first go through the sewage treatment plant for purification treatment and then discharge until it reaches the discharging standards.

In the short run, Fuzhou Sewage Treatment Plant will be expanded, and Linchuan Sewage Treatment Plant and Fubei Sewage Treatment Plant will be constructed, making recent treatment rate of sewage reach over 90%, and in the long run, Fuzhou Sewage Treatment Plant and Linchuan Sewage Treatment Plant will be expanded, and Jinchao Sewage Treatment Plant and Qiaodong Sewage Treatment Plant will be built, each with a processing scale of 360,000 m3/d and a treatment rate of 100%. The discharging standard should be subject to the Class I (B) standard as stated in the Discharge Standard of Pollutants for Urban Sewage Treatment Plant.

Table of Planned Sewage Treatment Plants in the Central Urban Area of Fuzhou


Current status

In the near term

In the long term

Floor area

hm2

Sewage treatment scale

(ten thousand m3/d)

Floor area

hm2

Sewage treatment scale

(ten thousand m3/d)

Floor area

 

hm2

Sewage treatment scale

(ten thousand m3/d)

Fuchuan Sewage Treatment Plant

14.66

6

14.66

12

14.66

16.5

Linchuan Sewage Treatment Plant



3

3.5

8.00

7

Fubei Sewage Treatment Plant



1.5

1

3.85

3.5

Jinchao Sewage Treatment Plant





8.50

8

Qiaodong Sewage Treatment Plant





1.50

1

Linchuan sewage pumping station and Chengbei pollutant intercepting pumping station will be built on the west bank of Yihuang River and the south bank of Fu River respectively.

Article 124    Drainage pipe network planning

For roads of over 40 m wide, the rainwater pipes and sewage pipes will be laid at the two sides of the side pavement or the non-motorized vehicle lane; for other roads, the rainwater pipes will be laid along the centerlines, and the sewage pipes along the side pavement or roadway unilaterally.

The main rainwater pipes and main sewage pipes will be laid along the arterial roads of the city; and pollutant intercepting pipes will be laid along Fuhe Avenue, Menghu Avenue and Shutong Road.

Section 5      Electric power project planning

Article 125    Prediction of electricity consumption and electricity load

In the central urban area, the total annual electricity consumptions will be 1.25 billion kWh and 3 billion kWh in the near and long terms respectively, with corresponding maximum load of 278,000 kW and 750,000 kW.

Article 126    Planning of power supply and transformer substations

(1)  Planning of thermal power plants

(2)  It is planned to construct a thermal power plant in Fuzhou, with a total installed capacity of 4×1000 MW and an installed capacity of 2×1000MW in the first phase. The project will network with a 500 KV transformer substation in Fuzhou after being completed. Planning of transformation substations.

It is planned to build 3 power supply sources in Fuzhou: Lichuan 220KV Substation (2×120MVA), which switches in Shitan 220KV Substation and Fengcheng Power Plant via 220KV power lines; Qiligang 220KV Substation (2×150MVA), which switches in the Tongcheng 220KV Substation and Songyuan 220KV Substation via 220KV power lines; and newly-built Chengnan 220KV Substation (2×120MVA), which switches in Fuzhou 500KV Substation and Qiligang 220KV Substation via 220KV power lines.

It’s planned to build 14 110KV substations in the central urban area of Fuzhou. Apart from the existing 7 110KV substations, six more 110KV substations will be built, including Qiaodong, Chengxi, Fengxi, Jiaoshang, Chonggang and Huangsigong substations, while the 110KV Hexi substation will be reconstructed.

Article 127    Construction of power supply and distribution network

It is planned that Lichuan 220KV Substation, Qiligang 220KV Substation and Chengnan 220KV Substation will use the double-supply or multi-supply ring connection modes to improve the liability of power supply, and the 220KV power lines that are switched in from Lichuan 220KV Substation, Qiligang 220KV Substation and Chengnan 220KV Substation will be laid overhead.

The 110KV power lines that are switched in from will be laid overhead or underground.

The 10KV power distribution network can refer to the function division defined by the urban planning, and grid layout of different areas and different lines and looped network and open loop running are preferred so as to improve the liability of power supply. The 10KV power lines will be laid underground on the east and south sides of the roads.

The high voltage corridor in the urban area should be combined with the construction of the green belts and the ecological green lands defined by the overall planning. The 220KV high voltage corridor will be reserved for a width of 40m, and 25m for 110KV high voltage corridor. No construction is allowed under the high voltage corridor.

Section 6      Urban communication project planning

Article 128    Planning of telecommunication project

According to the planning, in the urban central area, the coverage rate of urban telephones will reach 30 sets per hundred people, with a gross capacity of around 190,000 gates in the near term. And in the long term, the coverage rate will reach 50 sets per hundred people, with a gross capacity of 470,000 gates or so. In the short run, the coverage rate of mobile phones will reach 40% with 200,000 mobile users, and in the long run, the coverage rate will be 60%, with 450,000 mobile users. It is planned to retain the existing 3 telecommunication offices, and build 7 new telecommunication sub-offices.

We will perfect the urban communication pipeline network based on the existing pipelines, conduct overall consideration of China Telecom, China Mobile, China Unicom and cable television, and lay them in the same groove but on the other side of the power lines and form a weak current network. Communication service stations will be built every 500 to 1,000 m in the urban area, and public telephone kiosks for every 300-500 min the main streets.

Article 129    Postal facility planning

It’s planned to reconstruct and improve the postal bureau hub and build 6 new branch post offices. In the urban area, post offices will be built based on a service radius of 0.5 km, and other postal service points like newsstands will be based on a service radius of 250 m.

Article 130    Radio and television planning

We will accelerate the construction of cable television, proceed to build and reconstruct the cable wide-band network of cable radio and television network in the urban area, open multifunctional transmission services, and thus achieve modern management gradually, computer networking management of the whole industry, as well as digitalization, informationalization and networking of radio, film and television.

According to the planning, the coverage rate of cable television will reach 80% in the near term, with 114,000 users. And in the long term, the coverage rate will reach 100%, with 214,000 users. The pipelines of cable television should be buried unground on the other side of strong current lines like the power lines according to the Mandatory Provisions of Engineering Construction Standards.

Section 7      Urban gas project planning

Article 131    Gas source planning

The gas source of Fuzhou will come from West-East natural gas transmission project and Sichuan-to-East natural gas transmission project, and the storage and distribution station of natural gas will be located to the west of Wenchang Avenue and to the north of Jinpeng Avenue The original storage and distribution station of natural gas will be reserved.

Article 132    Gas supply scale

By 2020, the total gas supply scale of the central urban area will have reached 79200 t/a.

Article 133 Pipeline system planning

1.    The pipeline network will use high, medium and low voltage systems.

2.    The high-voltage pipeline network will be designed based on the pressure of 2.5MPa, and the medium voltage based on the pressure of 0.4Mpa.

3.    The pipeline should be designed according to the Code for Design of Urban Gas Engineering.

Section 8      Green land system and landscape planning

Article 134    Urban green land system planning

1.    Planning target

We will build an urban green network with sound ecological environment, rich cultural connotation, reasonable layout, local features and convenience for citizens.

2.    Planning index

In the long run, its green land will cover an area of 926.55 hectares, occupying 12.42% of the urban construction land. Its per capita green land area will be 12.35 m2, with public green land per capita of 10.93 m2.

3.    Park green land planning

It’s planned to construct 10 municipal integrated parks in the central urban area of Fuzhou, namely People’s Park, Rushui Park, Nanmen Park, Menghu Park, Fenggang Park, Linchuan Park, Caizi Park, Zhongzhou Park, Huangsigong Park, Celebrity Cultural & Ecological Park, 2 special parks, namely Wang Anshi Memorial Museum and Tang Xianzu Memorial Museum, and 2 belt parks, namely green belts ranging from 50 m to 500 m according different land conditions along the banks of Fu River and Fenggang River.

4.    Productive green land

It’s planned to expand the flower and tree bases in Xiaoqiao, Zhongling, Shangdundu Volcanoland and Wenquan Liuling, thus forming the four major flower and tree bases of the major urban area of Fuzhou. And Xiaoqiao Flower and Tree Productive Base will be the largest flower and tree production and sales base in Fuzhou.

5.    Ecological green land planning

It’s planned to construct large ecological green land areas to the north of Linchuan Avenue, to the east Beijing-Fuzhou Expressway, to the south of Anshi Avenue to the east of Wenchang Avenue, and to the north of Nanhuan Road.

6.    Green buffers

(1)   Sanitation isolation greenbelts

It’s planned to build green isolation buffers of no less than 20 m wide between the residential area and the industrial land by combining the road greening and residential green land.

(2)   Road green buffers

It’s planned to construct isolation greenbelts of above 50 m wide at the two sides of Jiangjia Station-Jiangbiancun Station Railway, Xiangtang-Putian Railway and Fuzhou-Yinchuan Expressway.

30 m-wide protection forest belts, 20 m-wide unilateral green land along the arterial roads of the city and 10 m-wide unilateral green land along the sub-arterial roads of the city will be constructed at the two sides of the outward traffic routes into the urban area.

(3)   Urban high voltage corridor greenbelts

It’s planned to construct high voltage corridor green buffers of different width in the central urban area of Fuzhou according to different voltage classes. The green buffer for the 110KV high voltage corridor will be 30 m wide, and 50 m wide for the 220KV high voltage corridor.

Article 135    Urban landscape planning

1.    Planning target

We will make full use of the sound natural environmental conditions, improve and optimize the artificial environment in an all-round manner and enrich its humanistic intension. The urban landscape will show and highlight the featured landscapes of Fuzhou with natural environment as the carrier, water system and major business roads as landscape axes and the key sections as landscape nodes. And we will create a landscape city that featured by the trinity of “mountain-water-city” and giving a feeling of “city on the waterfront, city with mountains, city by the waterside and city in the water”.

2.    Landscape planning

According to the planning, the central urban area of Fuzhou will form a landscape structure of “three axes, two belts, twelve areas and seven nodes”.

The “three axes” refer to the riverside landscape axis along Fu River and Fenggang River, the business and cultural landscape main axis formed by Yuming Avenue and Gandong Avenue, and the business and cultural sub-axis formed by Dagong Road, Fubei East Road, Linchuan Road, Rulin Road, Keji Avenue, Fudong Road and Fuxi Road.

The “two belts” indicate the riverside landscape belt along the water system, and the road landscape belt based on Fuzhou-Yinchuan Expressway, Yingbin Avenue and Rulin Avenue.

The “twelve zones” refer to the twelve different landscape zones, namely the landscape zone of old urban area, historical and cultural characteristic streets zone around Wenchang Bridge, downtown landscape zone, landscape zone of Zhanqian new area, traditional industrial landscape zone, modern industrial landscape zone, Zhongling culture and education landscape zone, Linchuan old urban area landscape zone, Yidongbei landscape zone, Yixi landscape zone, sub- administration center landscape zone and Linchuan culture and education landscape zone.

The “seven nodes” refer to the scenic landscape nodes including the administration center, Fuzhou Railway Station, sports center, Wenchang Bridge, the junction of Fu River and Yihuang River and Fenggang River, sub-administration center, and Shangdundu Zhongzhou Park, which are featured by icon buildings or landscape sculptures and located at the central city, the main city passageways and main bridges.

Section 9      Historical and cultural heritage protection planning

Article 136    Protection principles

(1) Protection of the historical and cultural relics should comply with the guideline of “protection upmost, and rescue first”, with social benefit as priority, and focus on the protection, repair and utilization of historical and cultural relics. On the premise of maintenance and renovation, we should actively develop and rationally make use of the historical and cultural relics.

(2)  We will carry out the principle of scientific protection and proper utilization. It requires protecting the historical and cultural relics listed as cultural relic protection units well and attaching high importance to the protection of historic architectures as well. Apart from determining the ranking of the relics in a timely manner based on the general investigation, we should dispose the relics whose original objects are not able to be preserved properly through argument by means of establishing logos or archiving.

(3)  For cultural relics protection, we should strictly retain the original appearance and structure of the relics; the protective construction should be conducted in favor of relics protection; and for the construction of control zones, we should fully consider the coordination with the surrounding environment of the relics protection units.

(4)  When planning, we should consider dedicatedly the relationships between part and whole, key and general, urban area and rural area as well as near and long terms. All that can be used by the relic protection units should be made use of positively, and this usage should be protective, rather than destructive. Any relics that are apt to be opened to the public should be developed as soon as possible, and for relics that are provisionally not apt to be opened, we should actively create relevant conditions for opening gradually on the premise of good protection. And those that are not suitable for opening should also be protected well.

Article 137    Protection measures

(1)  The famous historic and cultural cities, streets and villages and towns should strictly comply with relevant protection planning.

(2)  In case the urban development and construction involves with underground historic and cultural relics, they should first be investigated and explored by the culture (cultural relics) department who will give written opinions.

(3)  Regarding relics protection units of all levels, their protective range and construction control zones should be delimited by relevant people’s governments, and proper protection measures should be worked out and included into the urban and rural construction planning.

(4)  Within the protective range of culture relic protection units, no other construction projects or explosion and blasting, drilling, and digging are allowed. If the above said construction or operation is required due to special reasons, the safety of the relics protection units should be first guaranteed and the approval documents for the relics protection units by the people’s government should be publicized through verification after seeking the consent of the higher-level administrative department for cultural relics under the People’s Government.

(5)  Construction work conducted in the construction control zone of the relic protection unit should not damage the historic landscape of the relic protection unit. And the engineering design scheme should be submitted according to the level of the relic protection unit to the administrative department of urban-rural planning after being approved by the relevant administrative department of cultural relics.

(6)  For the national key cultural relic protection units, their protection plan should be worked out by the people’s government of county or above with the review of the provincial administration department of cultural relics and the provincial construction and planning department together. And after seeking the consent of the State Administration of Cultural Heritage, the plan should be submitted to the people’s government for approval. After that, the cultural relic protection units should be included into the local national economic and social development planning and urban-rural construction and development planning which should be consistent with the special planning of all kinds.

(7)  The stated-owned protection units should not be transferred or pledged, nor used for operation as enterprise assets.

(8)  For the nontransferable relics directory, we should work out specific protection measures which should be announced for implementation. And any repair work should be reported to the administration department of cultural relics of the relevant county people’s government where relevant relics are registered for approval.

Article 138    Determination of protective range

To implement the protection work of cultural relics, the determination of the protective range and construction control zone of the cultural relic protection unit should be made based on the historic, artic and scientific values and surrounding environment of cultural relics and historic sites, as well as on the consideration of the possible property right issues.

The cultural relic land included in this planning covers an area of 6.3 hectares, occupying 0.08% of the urban construction land with a per capita area of 0.08 m2.

List of the Protected Historic and Cultural Relics in the Central Urban Area

Name of relics

Location

Dynasty

Level

Protective range

Construction control zone

Construction control height

Tomb of Tang Xianzu

Inside the People’s Park

The Ming Dynasty

Provincial

Extending 20 maround the cemetery

Extending 20 m from the protection range

Building height should be controlled by the view analysis method stated in the Technical Regulations for Fuzhou Urban Planning Management.

Fuzhou Wanshou Palace

Luzichang Road of the urban area

The Ming and Qing Dynasties

Provincial

Extending 10 m from the body of cultural relics

Extending 20 m from the protection range

Shangyuan tomb group of the Han Dynasty

Fubei Town Linchuan District

The Han Dynasty to the Southern Dynasties

Municipal

Extending 20 maround the cemetery

Extending 20 m from the protection range

Xiuhua Mansion of Jinmuni Garden

In the campus of Fuzhou No. 1 Middle School

The Tang Dynasty

Municipal

Extending 10 m from the physical cultural relics

Extending 20 m from the protection range

Wenchang Bridge

Dagong Road of the urban area

The Qing Dynasty

Municipal

Extending 20 m at both ends of the bridge

Extending 50 m from the protection range

Xiaoyi Bridge

Qianjin Road of the urban area

The Qing Dynasty

Municipal

Extending 20 m at both ends of the bridge

Extending 30 m from the protection range

Catholic Church

Dagong East Road

The Republic of China

Municipal

Within the enclosing wall

Extending 20 m from the protection range

Zhu Wei’s Former Residence

Zhujia Village of Zhongling Office

The Ming Dynasty

Municipal

Extending 5 m from the physical cultural relics

Extending 10 m from the protection range

Ancestral halls of Chen’s Family

Chenjia Village of Zhongling Office

The Qing Dynasty

Municipal

Extending 5 m from the single architecture

Extending 10 m from the protection range

Senior official mansion of West Street, and screen wall with inscription of “Yu Xiu Que De”

No. 18, Heng Street of the urban area

The Qing Dynasty

Municipal

Extending 5 m from the physical cultural relics

Extending 20 m from the protection range

Zhengjue Temple

Heng Street of the urban area

The Tang Dynasty

Municipal

Within the enclosing wall

Extending 20 m from the protection range


Shimenting dwelling house

Chenjia Village of Zhongling Office

The Ming Dynasty

Municipal

Extending 5 m from the physical cultural relics

Extending 10 m from the protection range

Dwelling group in Rudong Park

Rudong Park of the urban area

The Qing Dynasty

Municipal

Extending 5 m from the single architecture

Extending 10 m from the protection range

Scholar-official mansion in Liushui Bridge

No. 23, Liushui Bridge of the urban area

The Qing Dynasty

Municipal

Extending 5 m from the physical cultural relics

Extending 10 m from the protection range

The original location of Tang Xianzu’s tomb and inkstone address

Lingzhi Mountain at the south side and east end of Wenchang Bridge of the urban area

The Ming Dynasty

Municipal

Extending 10 m from the physical cultural relics

Extending 20 m from the protection range

Ink washing pool relics

Zhouxueling  at the west end of Wenchang Bridge of the urban area

The Eastern Jin Dynasty

Municipal

Extending 10 m from the physical cultural relics

Extending 20 m from the protection range

“Niyantai” relics

The middle section of Shijing Road

The Northern Song Dynasty

Municipal

Extending 10 m from the physical cultural relics

Extending 20 m from the protection range

“Jinguogong River” relics

The middle section of Shijing Road

The Song Dynasty

Municipal

Extending 10 m from the physical cultural relics

Extending 20 m from the protection range

Section 10    “Five-line” control planning

The land use and all constructions in the planned area of the city will implement “five-line” control, namely “red line, green line, purple line, blue line and yellow line”, and the specific management requirements should comply with related regulations.

Article 139    “Red line” control

The red lines in this planning refer to the red lines of urban roads.

The control list of the minimum distance between the concession lines of buildings and the red lines of urban roads (m)

District

Width of road red line

Urban arterial road

W≥40

Urban sub-arterial road

20—40

Urban branch road

12—20

The old urban area

Building height

Multi-story and low-rise building H<24

6

4

3

High-rise building 24≤H<50

10

8

6

High-rise building 50≤H<100

12

10

8

The new urban area

Multi-story and low-rise building H<24

8

6

5

High-rise building 24≤H<50

15

12

10

High-rise building 50≤H<100

18

15

12

Article 140    “Green line” control

Urban green lines refer to the control lines of various green land scopes

①   Green line control scope includes the control lines of various urban green land scopes such as urban public green space, green buffer, productive green land, residential green land, affiliated green land, road greenbelt and ecological scenic forest land.

②   The public green land within the green line scope should be constructed according the requirements of the Standard for the Classification of Urban Land and Planned Land for Construction and Standards for Park Design, and not be used for other purposes.

③   Within the green line scope, any buildings, structures and other facilities that fail to comply with the planning requirements should be moved out within the time limit.

④   Any green buffers within the green line scope should be controlled strictly, and no other construction activities are allowed to avoid any occupation and damage of green buffers.

Article 141    “Purple line” control

Urban purple lines refer to the protection boundary lines of the national historic and cultural streets in the famous national historic and cultural cities and the historic and cultural streets published by the provincial, autonomous region and municipal people’s governments directly under the central government, as well as the protection boundary lines of protected historic buildings published by above-county people’s governments.

The following cultural relics are included: Tang Xianzu’s Tomb, Fuzhou Wanshou Palace, Wangyuan Han-Dynasty Tomb Group, Xiuhua Mansion of Jinmuni Garden, Wenchang Bridge, Xiaoyi Bridge, Catholic Church, Zhu Wei’s Former Residence, Ancestral halls of Chen’s Family, Senior official mansion of West Street, Zhengjue Temple, Shimenwan dwelling group, dwelling group in Rudong Park, scholar-official mansion in Liushui Bridge, the original location of Tang Xianzu’s tomb, ink washing pool relics, Niyantai relics, Jinguogong River relics, etc.

Absolute protection zone: according to the planning, the absolute protection scope is the extension of cultural relics periphery for 5-20 m.

Construction control zone: according to the planning, the construction control zone is the extension of the absolute protection scope for 10-50 m.

Landscape view corridor: according to the planning, the construction height of the surrounding buildings should be controlled by the view analysis method stated in the Technical Regulations for Fuzhou Urban Planning Management.

Article 142    “Blue line” control

Urban blue lines refer to the regional boundary lines for the protection and control of the urban surface water system and water source including the stream, river, lake, water reservoir, canal and wetland. To be specific, they are Fu River, Yihuang River, Fenggang River, Menghu Lake and Huangsigong Reservoir.

Article 143    “Yellow line” control

Urban yellow lines refer to the control boundary lines of urban infrastructural facility lands that have great impacts on the overall urban development, that are determined in the urban planning and that must be under control, including

①  Water supply facilities: Fubei Water Works, Linchuan Water Works, Zhongling Water Works and Nanqu Water Works.

②  Sewage treatment facilities: Fubei Sewage Treatment Plant, Fuzhou Sewage Treatment Plant, Linchuan Sewage Treatment Plant, Jinchao Sewage Treatment Plant and Qiaodong Sewage Treatment Plant.

Power supply facilities: 2 220KV substations (Linchuan 220KV Substation and Chengnan 220KV Substation); 14 110KV substations (Erxianqiao 110KV  Substation, Fuzhou 110KV Substation, Jinchao 110KV Substation, Zhongling 110KV Substation, Fubei 110KV Substation, Zhanping 110KV Substation, Shangdundu 110KV Substation, Qiaodong 110KV Substation, Chengxi 110KV Substation, Fengxi 110KV Substation, Jiaoshang 110KV Substation, Chonggang 110KV Substation, Huangsigong 110KV Substation, and Hexi 110KV Substation).

Corridor width in the 35-500KV high voltage overhead power line planning in the central urban area

Line voltage and class (KV)

Width of high voltage line corridor (m)

500KV

6075 m

220KV

3040 m

110KV

1525 m

35KV

1220 m

③  Telecommunication facilities: each post office, telecommunication hub and launching tower.

④  Gas facilities: natural gas station, and storage and distribution station.

Section 11    Environment protection planning

Article 144    Environment protection target

By 2020, the environment will fully live up to the standards. The air quality will reach Class II national standard (GB3095-1996); the water system will reach GB3838-2002 standard, and the area with five environment noise levels will meet up with the indicators for functional areas of all levels stated in the GB3096-2008 national standard.

List of Indicators of Fuzhou Environment Planning

Classification (I)

Classification (II)

Name of sub-item indicator

Standard

Environment quality indicator

Atmospheric environment

TSP annual mean (Mgm3)

S02 annual mean (Mgm3)

0.2

0.06

Water environment

Mean value of surface water COD (MgL)

Qualification rate of drinking water quality

20

100

Sound environment

Mean value of the arterial traffic noise dBA

Mean value of the regional environment noise dBA

<70

<50

Pollution control indicator

Air pollution control indicator

Smoke and dust control coverage rate %

Qualification rate of vehicle exhaust %

Qualification rate of industrial exhaust %

100

95

95

Water pollution control indictor

Industrial waste water discharge of 10,000-yuan production value (ton per thousand yuan)

Processing rate of industrial waste water %

Qualification rate of industrial waste water %

<20

90

90

Solid waste control indicator

Processing rate of industrial solid waste %

Utilization rate of industrial solid waste %

90

90

Urban environment construction indicator


Urban vaporization rate %

Urban sewage processing rate %

Domestic waste clearance rate %

Per capita public green land (m2/person)

Building density %

Per capita living space (m2/person)

Greening rate %

>95

90

100

14.7

30

12

45

Article 145    Atmospheric environment function zoning

According to the meteorological characteristics of the city and national standards for atmospheric environment quality, the atmospheric environment of the city can be divided into different functional zones, in which, the corresponding atmospheric quality standards (GB3095-1996) should be implemented.

Category I zone: for the planned ecological protection zone, Class I standards should be implemented for the atmospheric quality.

Category II zone: for the planned commercial and residential mixed zone, Jinchao industrial zone, business center, living and cultural and educational zone, and luxury villa zone, the Class II standards should be implemented.

Category III zone: for the planned Fubei industrial cluster area, the Class standards for the atmospheric quality should be implemented.

Article 146    Acoustics environment function zoning

The central urban area of Fuzhou is divided into ecological protection zone, industrial cluster zone, living and cultural and educational zone, villa zone, business center, mixed zone and other acoustics environment function zones which can be divided into 0-4 categories. Each category of function zone should execute the corresponding standards stated in the Environmental Noise Standard for Urban Area (GB30962008).

Article 147    Water environment function zoning

Surface water of Fuzhou can be divided into four classes, namely Category I, Category II, Category III and Category IV.

Name of function zone

Function type

Executive standards (GB 3838-2008)

Intakes of Zhongling Water Works, Nanqu Water Works, Linchuan Water Works, Fubei Water Works

Centralized domestic drinking water source first-class protection zone, precious fish protection zone, spawning site for fish and shrimp, etc.

Category II

Fuzhou section of Fu River

Centralized domestic drinking water source second-class protection zone, general fish protection area and swimming area

Category III

Dingjialong reservoir

 

General fish protection area and swimming area

Category III

Menghu Lake and Huangsigong reservoir

Recreational water area with no direct human body contact

Category IV

Fenggang River

Recreational water area with no direct human body contact

Category IV

Drain outlet of waste water treatment plant

Landscaping water and agricultural water zone

Category V

Section 12    Environmental sanitation planning

Article 148    Environmental sanitation facility planning

We will improve the clearance, collection, transfer and disposal system of the city, and strengthen its environmental sanitation management.

1.    Garbage collection and disposal

Litter bins will be set up at both sides of the streets and road junctions, with a spacing of 30-50 m for business streets, and 50-80 m for daily-life roads, and 100 m for general roads.

Waste transfer station: it’s planned to mainly build up small waste transfer stations, and add 42 new stations, each with a capacity of 12 tons and covering area of over 100 m2 each by the end of the planning period. The industrial refuse and household refuse in the industrial zone and storage zone will be shipped to the refuse processing plant by each enterprise.

Refuse disposal plant: we will retain the existing refuse processing plant in Fuzhou, which is located at Zhanping Township (Kongjia, Zhanping Village), Linchuan District with an area of 42 hectares. Its maximum daily processing capacity is 650 t/a with a total storage capacity of 4,000,000 m? and a service life of 19 years.

2.    Public toilet

It’s planned to set up public toilets in squares, parks, markets, parking lots and residential areas, with a spacing of 300-500 m for the busy streets, 750-1,000 m for general streets, and 300-500 m for newly-built residential areas. Each toilet will cover a building area of 30-50 m2, and 230 or so public toilets will be needed for the reconstructed sections of general old urban area and newly-built communities by the end of the planning period. All the public toilets will use water flush system, and the excrement will be processed in the septic tank before being discharged into the urban sewage system.

Section 13    Comprehensive disaster prevention planning

Article 149    Flood control standards

According to relevant provisions described in the national Standards for Flood Control (GB5020-94), the flood control standard for the central urban area of Fuzhou is once in  50 years in the near term and once-in-a-century in the long term.

Article 150    Flood control facility planning

The urban flood control facilities of the central urban area of Fuzhou are as follows:

1.    West bank of Fu River: by building Fujia embankment, back end of Xiayanhe embankment (connecting to Chengxi embankment) and the section from Hedong embankment to Liancheng Watergate, Fujia embankment, Yaoping embankment, Shangyanhe embankment and Xiayanhe embankment, Chengxi embankment and Hedong embankment will be connected with the newly built outlet watergate of Yellow Bridge of Fenggang River, to form a complete Linchuan embankment, which will protect the main urban area and Shangdundu urban area. Thus it will become a large embankment on the low-lying land of 30 km or so.

2.    East bank of Fu River: it is made up of Zhongzhou embankment, which starts from Shanghu Village of the east bank of Hedong embankment, passes by Qiaodong flood walls, surrounds Fu River and Qianjinpo Port, and ends at Shanghu Village, forming a separated guarding circle. In the near term, it will be composed of Yangzhou section of Zhongzhou embankment, which starts from Shanghu Village at the east bank of Fu River, surrounds Fu River and Qianjinpo Port, passes by the Qiaodong flood walls, and ends at Xiahuang Village.

3.    Shangdundu flood prevention walls: it’s planned to construct flood walls of about 1,000m long and 5.75mhigh, with anti-flood level of 41 m. It’s constructed based on the standard of flood occurring once in 20 years.

Article 151    Flood drainage facility planning

The flood drainage standard of the central urban area of Fuzhou is once in 20 years. The heavy rainfall will be discharged at the same day without flooding the key architectures. The standard for other areas will be once in 10 years.

According to the planning, the downtown of Fuzhou is divided into six zones of flood control by terrain and drainage facilities, with a total catchment area of 220 km2. The six flood control zones include:

1.    Yaoping flood control zone is located at the junction of the old urban area and the suburb, with a catchment area of 1.91 km2, the installed capacity of Yaoping electrical drainage station will be expanded to 220 kW.

2.    Yangdayu flood control zone is a bustling zone with a catchment area of 0.77 km2, which is located to the east of Gandong Avenue and to the north of Gongyuan Road;

3.    Chengxi flood control zone consists of the old urban area to the west of Gandong Avenue and inside Chengxi embankment, Chengxi suburb, planned urban area to the west of Gandong Avenue and inside Fufang, with a catchment area of 6.5 km2. A centralized flood control pumping station will be newly built to increase its installed capacity;

4.    Fufang flood control zone consists of the new urban area and part of the old urban area, with a catchment area of 3.32 km2;

5.    Shifu flood control area is mostly mountain land with good self-drainage conditions, so the arterial pipelines of the urban area can be made full use of to discharge flood water into Fenggang river;

6.    Fenggang River flood control zone: this zone covers all the flows from Fenggang River with a catchment area of 119 km2. This planning will mainly consider regulation of impoundment and self-drainage.

Article 152    Fire fighting facility planning

According to the planning, the fire station and fire hydrant will form a point-line-surface system. The fire command center of the city is set up at the municipal administrative office center. It’s planned to set up 16 standard fire fighting stations.

The arterial and sub-arterial roads of the city should meet up with the requirements for rescue and relief work, and the width and turning radius of the arterial roads, street roads, and cluster roads should conform to the operation requirements of fire fighting vehicles.

Article 153    Civil air defense project planning

According to the planning, by 2020, the central urban area of Fuzhou will need civil air defense projects of 675,000 m2, and four protection zones including the old urban area, Fubei area, the new urban area and Shangdundu area will be built. Command posts should be gradually set up in each protection zone in a distributed manner, and a civil air defense command center should be set up in the municipal government building.

A central hospital will be built in the city, with construction level 1, and 10 emergency hospitals will be built with construction level 2.

Article 154    Earthquake prevention planning

The central urban area of Fuzhou has a seismic intensity of below 6 degrees, so it needs no fortification. But the over-limited and super-high buildings and lifeline projects should be reviewed in terms of their aseismic design.